摘要 马里费鲁水电站位于非洲马里共和国境内的塞内加尔河上,是一座径流引水式发电站,总装机容量为3×21MW。文中介绍水电站的总体布置和各分项设计情况。项目建设资金通过向世界银行和欧洲投资银行贷款,因此,采用国际标准设计,设计流程符合世界银行的要求。 Felou hydropower station is located on the Senegal River within the territory of the Republic of Mali, Africa. The project is a run-off hydropower station, with a total installed capacity of 3 × 21MW. The paper makes an introduction to the general layout of the hydropower station and the design of each sub-item project. The international standards, whose design process catering to the World Bank's or the European Investment Bank's lending require-ments, are adopted for the project to get supporting loans from them.
作者 熊永成
出处 《红水河》 2014年第5期10-13,共4页 Hongshui River
关键词 马里费鲁水电站 国际标准 工程设计 Felou hydropower station in Mali international standard project design
  • 相关文献

参考文献1

  • 1广西电力工业勘察设计研究院,中国水电十四局有限公司勘察设计研究院,合编.马里费鲁水电站项目初步设计报告[R].南宁:广西电力工业勘察设计研究院,2010.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部