摘要
通过对防城港核电厂一期2台1 100 MW机组接入系统对广西电网调峰和网内其它形式电源的影响分析,提出近期广西电网缺少相应配套调峰电源投入情况下核电机组配合电网调峰的必要性,并根据防城港核电机组的特点,经系统分析比较,按近期和远期分别对防城港核电机组配合电网调峰的运行方式提出意见和建议。
Under the condition of Guangxi Power Grid lacking of supporting peak regulation power sources recently, the paper presents the necessity of the two 1100MW units of Phase-I Fangchenggang nuclear power plant in coordi-nation of power grid peak regulation through analyzing the impacts of these two units on Guangxi power grid peak reg-ulation and on other types of power sources. Furthermore, some opinions and suggestions are proposed on the short-term and long-term operating methods of these two units in coordination of power grid peak regulation through systematic analysis and comparison on the characteristics of these two units.
出处
《红水河》
2014年第5期60-62,83,共4页
Hongshui River
关键词
调峰
广西电网
防城港核电厂
peak regulation
Guangxi power grid
Fangchenggang nuclear power plant