结合电站更新改造项目探讨建设方在优化设计中的重要作用

Combined Power Plant Renovation Project Explores an Important Role in Optimizing the Design of the Building's Square
下载PDF
导出
摘要 通过结合在海港保税区1#35 kV变电站更新改造项目中,建设方依据项目需求、实际条件和长期运行经验,在设计阶段积极参与优化设计,提出大量的建设性意见,并取得明显实效的实例,指出在整个项目初期的设计阶段,建设方应明确项目需求,积极参与设计方案的优化,这样不仅能更好地控制项目的建设和投资,还能降低整个项目的费用。 By combining the harbor Bonded 1 # 35 kV substation renovation project, the construction side based on the project requtrements, the actual conditions and the long-term operational experience, and actively participate in the design phase to optimize the design, raised a lot of constructive criticism, and achieved remarkable effectiveness instance, pointed out early in the design phase of the project, the construction project shall clearly demand, and actively participate in the design of optimized, so not only can better control the construction and investment projects, but also reduce the cost of the entire project.
作者 齐颂
出处 《科技与创新》 2014年第19期10-11,共2页 Science and Technology & Innovation
关键词 变电站 优化设计 全寿命周期 经济效益 substation optimal design the whole life cycle economic
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部