某厂输煤6 kV电源二次系统因设计问题,频繁出现上位机运行设备无电流,皮带无法启动、无故跳闸等故障,因此决定对该电源二次系统进行改造升级。对在改造过程中出现的问题进行了分析,并提出相应的解决措施,以供参考。
Coal handling 6 kV power secondary systems due to design problems, frequently appears no current PC operating equipment, belt does not start, for no reason other failures trip, it was decided to upgrade the power to transform the secondary system. To appear in the transformation process problems were analyzed, and propose appropriate solutions for reference.
出处
《科技与创新》
2014年第19期34-35,共2页
Science and Technology & Innovation
关键词
火电厂
输煤6kV电源
二次系统
综保装置
thermal power plant
coal handling 6 kV power supply
the secondary system
comprehensive security device