提高红透山矿选矿厂磨矿效率途径探讨 被引量:4

Study on the Way of Improving Grinding Efficiency at Hongtoushan Mines
下载PDF
导出
摘要 针对红透山矿选矿厂生产实际情况,对影响磨矿效率的磨矿结构、磨矿介质、磨矿浓度、装球率和分级效率等因素分析,在理论上提出一系列提高磨矿效率的办法降低球磨机的介质尺寸,并通过实践证明将再磨球磨机介质由φ60mm降低到φ40mm铜回收率提高了2.05%,锌回收率提高了7.12%,金回收率提高了3.69%,银回收率提高了2.94%。 Based on the actual production condition at Hongtoushan Concentrator , some factors affecting grinding efficiency were analyzed such as grinding structure , grinding medium , grinding density , adding ball ratio , classification efficiency and so on , series way of increasing grinding efficiency was put forward on theoretically in order to decrease grinding medium size . It is proved that Cu recovery increases 2 .05 % , Zn recovery increases 7 .12 % , Au recovery increases 3 .69 % , Ag recovery increases 2 .94 % , after re-grinding medium size decreases from ?60 mm to ?40 mm .
出处 《有色矿冶》 2014年第5期29-31,共3页 Non-Ferrous Mining and Metallurgy
关键词 磨矿效率 磨矿介质 装球率 grinding efficiency grinding medium adding ball ratio
  • 相关文献

参考文献6

二级参考文献12

  • 1段希祥.球磨机钢球尺寸的理论计算研究[J].中国科学(A辑),1989,20(8):856-863. 被引量:64
  • 2段希祥.应用小钢球磨矿的工业试验[J].有色金属:选矿部分,1987,(6):2-6.
  • 3段希祥.改进云南铜选厂第二段磨磨矿介质的研究[C]//云南省有色金属学会,年会论文集,1992.
  • 4段希祥.磨矿机耗能特性与节能途径讨论[C].第二界采选节能学术会议论文,1985.
  • 5李启衡.磨矿过程节能的几个问题[C].昆明工学院,1983.
  • 6CE安德列耶夫等著,北京矿业学院译.有用矿物的破碎磨矿与筛分[M].北京:中国工业出版社,1963.
  • 7段希祥.用周边排矿棒磨机磨碎锡矿石的应用研究[C].昆明工学院(云锡专辑)。1982.
  • 8Duan Xi- Xiang,The Research to Rise Efficiency of Fine Grinding, Proceeding of the First International Conference on HydrometaUurgy, ICHM, 1988,362 - 365.
  • 9段希祥.选择性磨矿及应用[M].北京:冶金工业出版社,1991.
  • 10段希祥.球径半理论公式的修正研究[J].中国科学(E辑),1997,27(6):510-515. 被引量:33

共引文献89

同被引文献40

  • 1崔学茹,刘厚乾,李明东.磨矿介质与磨矿效率剖析[J].矿业工程,2005,3(6):35-37. 被引量:18
  • 2段希祥.球磨机钢球尺寸的理论计算研究[J].中国科学(A辑),1989,20(8):856-863. 被引量:64
  • 3石贵明,肖庆飞,罗春梅,郭永结,段希祥.球径精确化对选矿指标的影响研究[J].金属矿山,2007,36(1):55-57. 被引量:14
  • 4罗春梅.球磨机节能降耗新途径机理及应用研究[D].云南:昆明理工大学,2009.
  • 5Morrison R D, Richardson J M.JKsimMet-asimulator for analysis,optimasation and design of comminution circuits [ C ]//Mineral Processing Plant Design, Practice and Control Conference,Vancouver, B C.,Canada.New York:Society for Mining, Metallurgy and Exploration, 2002 : 442- 460.
  • 6Lynch A J.Mineral Crushing and Grinding Circuits:Their Simulation, Optimization Design and Control[ M ].New York: Elsevier, 1977.
  • 7Napier-Munn T J,Morrell S,Morrison R D,et al.Mineral Comminution Circuits:Their Operation and Optimization [ M ].Bris-bane: Julius Kruttschnitt Mineral Research Centre, University of Queensland, 1996.
  • 8Chibwe P,Simukanga L K,Witika L K.Designing and testing the representative samplers for sampling a milling circuit at Nkana copper/cobalt concentrator [J].African Journal of Science and Technology, 2005,6(2 ) : 102-112.
  • 9Genc O .Optimization of a fully air-swept dry grinding cement raw meal ball mill closed circuit capacity with the aid of simulation [J].Minerals Engineering,2015,74: 41-50.
  • 10Irannajad M,Farzanegan A,Razavian S M.Spreadsheet- based simulation of closed ball milling circuits[J].Minerals Engineering, 2006, 19( 15 ) : 1495-1504.

引证文献4