摘要
介绍了某电厂600MW燃煤汽轮发电机组及其发电机变压器组保护的投运情况,通过检查试验确定了主变压器低压侧橡胶套管积水是引发发电机定子接地保护跳机的原因,提出了具体的整改、预防措施。
The operation situation of the 600 MW coal-fired turbo-generator set and its generator-transformer set protection in a power plant was introduced. Based on inspection and test,it was found that there was stagnant water in the rubber sleeve in lowvoltage side of the main transformer,and which caused the generator stator grounding protection tripping accident. The concrete reformation and preventive measures were proposed.
出处
《华电技术》
CAS
2014年第10期40-42,78,共3页
HUADIAN TECHNOLOGY
关键词
发电机
定子接地
跳机保护
橡胶套管
预防措施
generator
stator grounding
protection tripping
rubber sleeve
preventive measure