期刊文献+

水流外掠单体冰柱融化速率试验研究

Experimental Research of the melting Rate of Water Flow Across Sngle Ice Pillar
下载PDF
导出
摘要 建立水流外掠冰柱实验台,分别开展了水流速度(0.02、0.03、0.04、0.05、0.06和0.07m/s)、水流温度(7、10、13、16和19℃)、冰柱直径(60、70、80和105mm)及冰柱初始温度(-12、-8和-5℃)对于冰柱融化速率的影响研究。通过对融化时间的统计和分析,获得以下结论:水流温度对于融化时间的影响呈幂函数规律;水流速度和冰柱直径对于融化时间的影响呈线性规律;冰柱初始温度对于融化时间影响较小。 The experiment table of water flow across ice pillar was established in this research which mainly analysis how the water velocity (0.02 m/s,0.03 m/s,0.04 m/s,0.05 m/s,0.06 m/s and 0.07m/s),diameter of the ice pillar (60mm、70mm、80mm和105mm),the temperature of water flow(7℃、10℃、13℃、16℃和19℃) and initial temperature of the ice pillar (-12℃、-8℃和-5℃) influenced on the ice pillar melting rate.By analyzing the statistic of melting times,some conclusion could be got as follows:The effects of water temperature on melting time are representing as power function.The effect of water ve-locity and diameter of the ice pillar on melting time are representing as linear.And the influence of initial temperature of ice pillar on melting time has a minimal effect.
作者 孟凡康 于航
出处 《流体机械》 CSCD 北大核心 2014年第10期73-77,共5页 Fluid Machinery
关键词 冰柱 水流外掠 融化速率 试验研究 ice pillar water flow across ice pillar melting rate experimental research
  • 相关文献

参考文献12

二级参考文献21

  • 1郁庆庆,章学来.冰蓄冷工程测试分析与评估[J].上海海事大学学报,2005,26(3):14-17. 被引量:2
  • 2吴逸飞,陈杨华.冰蓄冷空调系统运行特性的仿真实验研究[J].制冷,2005,24(3):11-14. 被引量:1
  • 3陈建中,金苏敏,王伟.冰蓄冷空调系统实验台的研制[J].实验技术与管理,2007,24(1):57-60. 被引量:1
  • 4全国冷冻设备标准化技术委员会.GB/T18430.2-2001户用和类似用途的冷水(热泵)机组[S].中国标准出版社,2001.
  • 5全国冷冻设备标准化技术委员会.GB/T10870-2001容积式和离心式冷水(热泵)机组性能试验方法[S].北京:中国标准出版社,2001.
  • 6国家质量技术监督局.JJF1059-1999测量不确定度评定与表示[S].中国计量出版社,1999.
  • 7国家质量技术监督局.GB/T15481-2000检测和校准实验室能力的通用要求[M].中国标准出版社,1999.
  • 8邓建忠,刘之行.计算方法[M].西安:西安交通大学出版社,2001.
  • 9张建一.制冷装置节能技术[M].北京:机械工业出版社,2000.
  • 10费业泰.误差理论与数据处理[M].北京:机械工业出版社.2005.1—20.

共引文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部