摘要
搞好既有线站内信号设备换装停用前的技术准备,应做好图纸、查找故障小工具和室内拆配线三方面的工作,以此供从事施工工作的技术人员参考。
In order to improve the data reloading of station signal equipment on existing line, the techni- cal preparations work, including drawings, tools for troubleshooting and indoor assembly line, should be prearranged before the signal equipment reloaded and deactivated. This paper provides a reference for technical staff engaging in construction work
出处
《铁道通信信号》
2014年第9期34-37,共4页
Railway Signalling & Communication
关键词
信号
技术
准备
Signal
Technology
Preparation