摘要
根据污水泵站工艺流程,通过对现有集控系统进行分析,解决了原系统中存在的问题,并根据用户需求,对控制系统进行了改造,达到了预期的目标。
According to the feature of sewage pumping station, the existing centralized control sys-tem was analyzed, and the problems existing in the original system were solved. The centralized controlsystem was reconstructed based on the actual requirements of users, and the desired goal was achieved.
出处
《中国给水排水》
CAS
CSCD
北大核心
2014年第22期126-128,共3页
China Water & Wastewater
关键词
IP城域网
控制系统改造
污水泵站
IP-MAN
control system reconstruction
sewage pumping station