摘要 针对某风洞消声室结构施工中,结构剪力墙较高,墙体垂直度要求高及结构施工前室内大型设备已安装,无法从地面搭设满堂脚手架作为梁板模板支撑等施工难题,提出了高大剪力墙施工精度控制技术和现浇梁板无地面支撑可测可控支撑体系施工技术,通过该技术顺利解决了施工难题。 During the construction of the muffler room of a wind tunnel,the standard of the squareness for the high shear walls is strict. Full scaffold framing can't be applied to support the mould boards for the beams and plates because of the large-scale equipment installed before the construction. Based on above problems,the technologies of the accuracy controlling for the high shear walls and the determinable and controllable framing for the mould boards for the beams and plates were proposed. And the problems are solved.
机构地区 中国人民解放军
出处 《施工技术》 CAS 北大核心 2014年第21期10-12,26,共4页 Construction Technology
关键词 风洞 混凝土 支撑 剪力墙 精度 施工技术 wind tunnels concrete supports shear walls accuracy construction
  • 相关文献

参考文献6

  • 1中国建筑科学研究院.GB50204--2002混凝土结构工程施工质量验收规范(2010版)[S].北京:中国建筑工业出版社.2010.
  • 2中国人民解放军63926部队.厂房大跨度现挠梁板支撑体系施工方法:中国,ZL200910104717.X[P],2012-03-28.
  • 3北京钢铁设计研究总院.GB50017-2003钢结构设计规范[S].北京:中国计划出版社.2003.
  • 4中国建筑科学研究院.JGJ130-2011建筑施工扣件式钢管脚手架安全技术规范[S].北京:中国建筑工业出版社,2011.
  • 5中国建筑科学研究院.GB50010-2010混凝土结构设计规范[s].北京:中国建筑工业出版社,2010.
  • 6冶金工业部建筑研究总院.GB50205-2001钢结构工程施工质量验收规范[S].北京:中国计划出版社,2001.

共引文献493

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部