无围岩断裂带时隧道交叉段开挖的影响分析

An Analysis on Influence of Excavation of Tunnel Cross Section of No-enclosing-rock Fault
下载PDF
导出
摘要 结合青岛地铁一期3号线的清江路站工程,研究了在无围岩断裂带环境下隧道进行交叉段开挖时引起的围岩应力场和位移场的变化情况以及衬砌结构的施工力学行为.论述了围岩支护工艺、开挖速度、开挖方法和路面荷载对隧道开挖的影响.为同类工程施工提供借鉴. Combined with Qingj iang Road Station Engineering of Qingdao Metro Line 3 of Phase I,the author of this paper studies the changes of enclosing rock stress field and displacement caused by the excavation of the tunnel cross-section under the construction environment of no enclosing rock fault,as well as the mechanical behavior of the lining construction.He also discusses the influence of enclosing rock supporting technology,excavation methods and road load on the tunnel excavation,providing reference for similar projects.
作者 杨建军
出处 《河北建筑工程学院学报》 CAS 2014年第1期13-17,共5页 Journal of Hebei Institute of Architecture and Civil Engineering
关键词 隧道工程 无围岩断裂带 数值模拟 施工技术 tunnel proj ect no enclosing rock fault numerical simulation construction technology
  • 相关文献

参考文献5

二级参考文献15

  • 1顾拥武.砂层地铁车站暗挖施工技术研究[J].铁道标准设计,2004,24(11):59-63. 被引量:5
  • 2黄润秋,许强.显式拉格朗日差分分析在岩石边坡工程中的应用[J].岩石力学与工程学报,1995,14(4):346-354. 被引量:121
  • 3梁海波,李仲奎,谷兆祺.FLAC程序及其在我国水电工程中的应用[J].岩石力学与工程学报,1996,15(3):225-230. 被引量:61
  • 4彭泽润.北京地铁复-八线土建工程施工技术[M].北京:中国科学技术出版社,2003.
  • 5GB50299-1999.地下铁道工程施工及验收规范[S].[S].,..
  • 6关宝树.隧道施工要点集[M].北京:人民交通出版社,2003..
  • 7GB50157-2003.地铁设计规范[S].[S].,..
  • 8Wagner H. Design and undreground excavation in highly stressed rock[A]. In : Herget and Vongpaisal eds. Proceedings of the 6th international Congress on Rock Mechanics [C]. Rotterdam : Balkema, 1987. 1433-1456.
  • 9Aset M R, Reddish D J. Lloyd P W. Rock2support interaction analysis based on numerical modeling [J] . Geotechnical and Geological Engineering, 2000,19:23-27.
  • 10关宝树.隧道设计要点集[M].北京:人民交通出版社,2004.17-28.

共引文献60

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部