摘要
对比了福建省内某电厂一期、二期工程600 MW发电机组凝结水再循环管道的设计和布置,经过分析,得出了一期管道振动的原因。在二期设计中做出了一些改进,基本解决了凝结水再循环管道的振动问题。
Comparison of a power plant in Fujian Province in the first phase, the second phase of 600 MW turbine condensate recirculation piping design and layout, after analysis, figured out why the pipe vibration of a period. In two designs made some improvements, basically solved the condensate recirculation piping vibration problems.
出处
《科技与创新》
2014年第21期6-7,共2页
Science and Technology & Innovation
关键词
火力发电厂
凝结水
再循环管道
振动
thermal power plant
condensate
recirculation piping
vibration