核电工程项目调试工期的影响因素与优化 被引量:1

Factors Affecting the Duration of the Nuclear Power Project Commissioning and Optimization
下载PDF
导出
摘要 调试启动工作是核电工程项目进度控制中非常重要的环节,对整个工程的顺利投入运行有着重要的作用。如果调试工期过长,则会导致核电工程不能按期交付使用,从而对整个核电工程的进度造成影响。主要探讨了核电工程项目调试工期的影响因素和优化措施。 Debug to start work in the nuclear power project schedule control a very important part of the whole project successfully put into operation plays an important role. If the commissioning period is too long, it will lead to the use of nuclear power engineering can’t be delivered on time, thus affecting the progress of the nuclear power project. Mainly discusses the factors and optimization measures nuclear power project commissioning duration.
作者 谢华
出处 《科技与创新》 2014年第21期79-80,共2页 Science and Technology & Innovation
关键词 核电工程 调试工期 管理水平 环境监管 nuclear power engineering commissioning period management environmental regulation
  • 相关文献

参考文献1

二级参考文献1

  • 1BOYKO. N. N. Electric equipment of the reactor con- trol and protection[ R]. Moscow. NPP VNIIEM ,2003 : 16 -21.

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部