客运专线64m双线节段拼装箱梁施工技术 被引量:7

Construction Technology for 64 Meters Double Track Section Assembled Simply Supported Box Girder of Passenger Dedicated Lines
下载PDF
导出
摘要 以西成客专汉中汉江特大桥双线铁路64 m节段拼装预应力混凝土箱梁的节段预制、架设施工为研究对象,通过对施工过程工艺控制,总结客运专线双线大跨节段拼装简支箱梁梁段预制、架设施工技术,包括预制阶段的模板、胎具的加工及安装使用,钢筋工程,预埋件安设、孔道成孔和混凝土工程;架设阶段的梁段线形控制、预拱度设置、湿接缝施工、预应力张拉及张拉过程中的梁体体系转换。 Based on the segments precasting and erecting of the double track of 64m consolidated sections of prestressed concrete simply-supported box girders of Hanzhong-Hanjiang river super bridge on Xi' an-Chengdu Passenger Dedicated Line,through the control management on the worksite, the author summarizes the construction techniques of long-span of consolidated sections of simply-supported box girders segments precasting and segments erecting, including the steel tem- plate and molds processing and installation, reinforced engineering, the technology of laying embedment parts and pre-set- ting hole and concrete engineering in precasting stage; the linear control, the pre-eamber setting, the wet-joint construc- tion, the system transformation of girder in tension prestress in erecting stage.
作者 樊立龙
出处 《铁道建筑技术》 2014年第10期14-18,共5页 Railway Construction Technology
关键词 客运专线 节段预制 拼装架设 湿接缝 线形控制 passenger dedicated line prefabricated section assembling erect wet-joint work linear control
  • 相关文献

参考文献3

  • 1张祥君.西成客专64m双线简支箱梁设计[J].山西建筑,2011,37(13):170-171. 被引量:2
  • 2中铁三局集团有限公司,中铁六局集团有限公司.TB10752-2010高速铁路桥涵工程施工质量验收标准.[S].北京:中国铁道出版社,2011:107-111.
  • 3中铁三局集团有限公司.铁建设[2010]24l号高速铁路桥涵工程施工技术指南[S].北京:中国铁道出版社,2011:112-116.

二级参考文献1

共引文献2

同被引文献26

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部