摘要 在复合地层盾构法隧道施工中,如何提高盾构机推进速度一直是盾构机设计、施工人员研究的重点。以长沙轨道交通1号线五一广场到营盘路隧道工程为研究背景,现场采集盾构机掘进参数,应用SVM,建立了"五营"区间复合地层盾构机推进速度的预测数学模型,并对模型进行检测,检测结果表明该预测模型对推进速度预测的平均相对误差≤7%,验证了该模型对推进速度预测的有效性。 How to improve the excavation speed is always the important point for researchers in shield tunneling machines design and application in complex stratum. In this paper, taking the tunnel project of Changsha metro line 1 between Wuyi Square and Yingpan Road as background, the tunneling parameters of shield machine was collected. SVM is used to estab- lish the mathematical model of shielding speed prediction in the complex stratum of "WuYing" zone. And the test results of the model showed that the average relative error of the prediction model to predict the speed is ≤7% , and demonstrated the effectiveness of the model in the shield tunneling machine speed prediction.
出处 《铁道建筑技术》 2014年第10期48-51,共4页 Railway Construction Technology
基金 国家863计划"大直径硬岩隧道掘进装备(TBM)关键技术研究及应用" 项目编号2012AA041801
关键词 盾构掘进机 掘进参数 推进速度 SVM模型 shield tunneling machine tunneling parameters excavation speed SVM model
  • 相关文献

参考文献7

  • 1李文勇.盾构隧道快速施工法试验研究[J].施工技术,2009(5):55-64.
  • 2张厚美,吴秀国,曾伟华.土压平衡式盾构掘进试验及掘进数学模型研究[J].岩石力学与工程学报,2005,24(A02):5762-5766. 被引量:72
  • 3袁敏正,鞠世健,竺维彬.广州地铁一号线和二号线盾构机适应性研究与探讨[J].现代隧道技术,2004,41(3):31-34. 被引量:20
  • 4邓乃扬.田英杰.支持向量机的理论、算法与拓展[M].北京:科学出版社.2009:182-189.
  • 5FARMER J D, SIDOREICH J J. Predicting chaotic time series [ J ]. Physics Review Letter, 1987 ( 7 ) :45 - 51.
  • 6TAKWNS F. On the numericai of the dimension of an at- tractor[ C]//RAND D. YOUNG L S. Dynamical systems and turbulence, lecture notes in mathematis. Bertlin: SPRINGER-Verlag. 2001:77.
  • 7VAPNIK V N. Statstical learing theory [ M ]. New York : Wiley, 2008 : 32 - 38.

二级参考文献8

  • 1龚秋明,赵坚,张喜虎.岩石隧道掘进机的施工预测模型[J].岩石力学与工程学报,2004,23(z2):4709-4714. 被引量:42
  • 2Sanio H E Prediction of the performance of disc cutters in anisotropic rock[J]. Int. J. of Rock Mech. and Mining Sci. and Geomech. Abs.,1985, 22(3): 153-161.
  • 3Roxborough F F, Phillips H R. Rock excavation by disc cutter[J]. Int.J. of Rock Mech. and Mining Sci. and Geomech. Abs., 1975, 12:361-365.
  • 4Copur H, Rostami J, Ozdemir L, et al. Studies on performance prediction of roadheaders based on field data in mining and tunneling projects[A]. In: Int. the 4th Mine Mechanization and Automation Symp[C]. Brisbane, Australia: [s. n.], 1997. 1-7.
  • 5Rostami R, Ozdemir L, Nilson B. Comparison between CSM and NTH Hard Rock TBM Performance Prediction Models[M]. Las Vegas, NV: Isdt., 1996.
  • 6Maidl B, Herrenknecht M, Anheuser L. Mechanized Shield Tunnelling[M]. Berlin: Ernst and John, 1996. 221-225.
  • 7何於琏.TBM施工进度的科学预测方法[J].铁道工程学报,1999,16(2):94-98. 被引量:10
  • 8刘明月,杜彦良,麻士琦.地质因素对TBM掘进效率的影响[J].石家庄铁道学院学报,2002,15(4):40-43. 被引量:34

共引文献89

同被引文献73

引证文献10

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部