饱水粉砂地层盾构穿越既有建筑群施工技术探讨 被引量:3

Approach on Construction Technology of Shield Crossing Existing Building in Saturated Silt Strata
下载PDF
导出
摘要 在城市地下进行盾构施工,不可避免要穿越建筑物。以苏州市轨道交通2号线为例,通过对盾构在饱水粉砂层以小半径曲线穿越建筑群采用的土仓压力、出土量、泡沫剂、监控数据等参数的分析和探讨,研究和总结了苏州地铁盾构在粉砂层穿越建筑群采用的技术措施,希望对同类工程施工提供借鉴。 In the construction of underground shield tunneling, sometimes shielding will inevitably cross the buildings. Taking the Suzhou Metro Line 2 as an example, through analysis and discussion of soil pressure, the excavation volume, foams, monitoring data and other parameters used in small radius curve crossing buildings in saturated silt strata, this paper studies and summarizes the technical measures used in Suzhou Metro shield through the buildings in silt layer, hoping to provide a reference for similar projects.
作者 刘金山
出处 《铁道建筑技术》 2014年第10期52-56,共5页 Railway Construction Technology
关键词 盾构 穿越建筑群监控量测 饱水粉砂地层 shield crossing buildings monitoring and measurement saturated silt strata
  • 相关文献

参考文献4

二级参考文献12

共引文献23

同被引文献24

引证文献3

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部