某铁路900t预制箱梁运输通道遇见问题及对策 被引量:2

Problems and Countermeasures for the Transportation of 900 Tons Precast Concrete Box Girders
下载PDF
导出
摘要 针对沈丹铁路南芬制梁场运梁通道场地受限的条件,阐述运梁通道在实施过程中遇到的一些问题及其解决措施,通过Midas Civil8.05、理正结构设计工具箱等软件设计一套较为合理的结构设施,满足900 t预制箱梁的运输要求,从而期望为类似的箱梁运输通道实施提供借鉴。 In view of the condition of Nanfeng beam and girder station on Shenyang to Dandong railway, the paper elaborates the problems and their solutions in the implementation of the girder channel. With the help of Midas Civil 8.05 and Richard, the structure design toolbox software, reasonable structure was designed and it could satisfy the demand of the 900 t preeast concrete box girders; thereby, provide reference for similar box girder transport corridor.
作者 付军恩
出处 《铁道建筑技术》 2014年第10期88-91,共4页 Railway Construction Technology
关键词 预制箱梁 运输通道 设计与实施 precast box girder transport corridor design and implementation
  • 相关文献

参考文献2

  • 1中华人民共和国铁道部.铁建设[2008]189号铁路大型临时工程和过渡工程设计暂行规定[S].北京:中国铁道出版社,2009:13.
  • 2中华人民共和国铁道部.铁建设[2005]108号铁路桥梁钢结构设计规范[S].北京:中国铁道出版社,2005.

共引文献2

同被引文献21

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部