3[2]Vranas P B,Bertsimas D,Odoni A R.The multi-airport ground-holding problem in air traffic control[J].Operations Research,1994,42(2):249-261.
4[4]Bertsimas D,Patterson S S.The air traffic flow management problem with enroute capacities[J].Operations Research,1998,46(3):232-237.
5[6]Panayiotou C G.A sample path approach for solving the grou-nd-holding policy problem in air traffic control[J].IEEE Transactions,2001,9(3):272-279.