1McKim R, Hegazy T, Attalla M. Project performance control in reconstruction projects[J]. Journal of Construction Engineering and Management, 2000, 126 (2): 137-141.
2Rwelamila P D, et al. Total systems intervention: An integrated approach to time, cost and quality mawgement[J]. Construction Management and Economics, 1995, 13: 235-241.
3Babu A J G, Suresh N. Project management with time, cost, and quality considerations[ J]. European Journal of Operational Research, 1996, 88 (2): 320-327.
4Do Ba Khang, Yin Mon Myint. Time, cost and quality trade-off in project management: A case study[J]. International Journal of Project Management, 1999, 17(4): 249-256.
5Shih-Wen Hsiao. Fuzzy logic based decision models for product design[J]. International Journal of Industrial Ergonomics, 1998,21: 103-116.
6袁建新,迟晓明.工程造价控制[M].北京:中国建筑工业出版社,2004.33-34.
7Abernethy M.A,Brownell P.Management Con-trol Systems in Research and Development Organizations:TheRole of Accounting,Behavior and Personnel Controls. Account-ing Organizations and Society . 1997
9Merchant K,Van der Stede W.Management Control Systems:Performance Measurement,Evaluation and Incentives. . 2007
10Whitey, M,Daft, R. L,Cooper, W. H.Measures of Perrow‘s work unit technology, an empirical assessment and a new scale. The Academy of Management Journal . 1983