摘要
研究一类推广的从准备时间ri到交工期di的多重r/d区间排序问题——有区间约束单机延误排序问题。就该问题的一般情形而言证明了它是NP—困难的,对问题的特殊情形证明了它是多项式时间可解的。
his paper studies generated single machine tardy scheduling problem with mutiple release time/deadline intervals(r/d),namely,from ready time to due date.Generally speaking,the problem is proved to be NPhard in the strong scene,and particular problem is solvable with polynomial time.
出处
《运筹与管理》
CSCD
1998年第2期13-19,共7页
Operations Research and Management Science