摘要 先进主控室综合布置的设计目标是使主控室内各种监控设备的布置尽量处于最佳状态,为操纵员提供各种工况下所需的集中监控信息与手段,以利于操纵员和系统最大限度地发挥能力。本文重点介绍了先进主控室综合布置设计的原则方法,对比分析了CPR1000已建项目与后续新项目在主控室布置方面存在的差异。 The general layout of the advanced main control room (MCR) was designed to make the monitor and control equipment in MCR in the best combination to provide the operators with the concentrate information and means ,so the operators and the system can perform at their best .The principle and method of the MCR general layout and the difference between the CPR1000 built projects and new projects were analyzed in this paper .
出处 《原子能科学技术》 EI CAS CSCD 北大核心 2014年第B11期917-920,共4页 Atomic Energy Science and Technology
关键词 主控室 综合布置 核电厂 main control room general layout nuclear power plant
  • 相关文献

参考文献4

  • 1孙永滨,蒋晓华.压水堆核电站先进控制室布置设计[J].核动力工程,2008,29(3):73-77. 被引量:14
  • 2于正龙,邹杰,刘燕子.CPRl000核电站主控室功能分析与分配[J].大亚湾核电,2008(5):17-19.
  • 3刘燕子,周粲,张黎明,等.CPRl000先进主控室人因工程设计[J].大亚湾核电,2009(2):13-14.
  • 4昌海,鲍麒,吴一谦.岭澳核电站二期主控室大屏幕显示系统[J].大亚湾核电,2008(5):74-75.

共引文献13

同被引文献21

引证文献2

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部