摘要
由于DCS的引入,核电厂全范围模拟机的开发遇到了新的问题和挑战。本文从DCS常见的模拟方案特点出发,结合核电厂的特点,对核电厂全范围模拟机中DCS的不同模拟方案进行了分析比较,最后根据项目的不同情况,推荐了最优的DCS仿真开发方案。
Since the DCS technology were introduced into the nuclear power plant ,new challenges also have been brought into the full scope simulator development .The advantages and disadvantages of the most popular simulated solutions of the nuclear power plant DCS were compared and analyzed in this paper .The speciality of the nuclear power plant was also taken into account the analysis .In the end the optimized DCS simulation solution was recommended according to the analysis and the different situation of the nuclear power plant .
出处
《原子能科学技术》
EI
CAS
CSCD
北大核心
2014年第B11期1073-1077,共5页
Atomic Energy Science and Technology
关键词
核电厂
DCS
全范围模拟机
模拟方案
nuclear power plant
DCS
full scope simulator
simulated solution