摘要
根据矿图图例绘制的特点,为了达到高效绘制矿图的目的,提出了基于.Net框架的AutoCAD二次开发技术实现矿图图例动态拖动及交互调整绘制的方法,着重分析了该方法的实现原理及流程,并在此基础上针对AutoCAD 2008绘图软件完成了相关功能模块的编制与嵌入.实践应用结果表明该模块完全胜任矿图图例的绘制工作,大大提高了绘图效率,极大地满足了现场工程技术人员矿图绘制的需要.
According to characteristics of the blocks in mine graph,in order to achieve high efficiency drawing mine graph,the current paper presented a new method of using secondary development of AutoCAD based on.Net Framework to realize dynamic drag and interactive adjustment drawing the various blocks in mine graph.The principles and processes of this method were analyzed.Based on the method,we developed the programme for AutoCAD 2008,and applied it to practice and got the approving result.It greatly improved the efficiency of drawing,and met the requirements of site engineering and technical personnel mine chart drawing.
出处
《安徽大学学报(自然科学版)》
CAS
北大核心
2014年第5期31-36,共6页
Journal of Anhui University(Natural Science Edition)
基金
国家自然科学基金资助项目(51304006)
安徽省自然科学基金资助项目(1408085QE87)
安徽理工大学青年骨干培养基金资助项目(20120012)