期刊文献+

高陡斜坡作用下群桩基础设计计算方法 被引量:20

Design and Calculation Method for Pile Group Foundation in High and Steep Slope
原文传递
导出
摘要 基于陡坡双桩柱基础探讨了陡坡群桩基础承载机理,提出了陡坡与群桩相互作用简化分析模型,得到了陡坡群桩基础的等效分析模型,即侧向受荷高承台嵌岩群桩基础分析模型;综合考虑滑坡推力与简化分析模型建立了基于结构位移法的陡坡群桩基础计算分析方法,并提出了同时考虑稳定安全与经济最优的陡坡群桩基础优化设计方法。研究结果表明:陡坡群桩基础应尽量减小承台底部至最危险滑动面的距离,嵌岩深度为4倍桩径时能满足工程要求,群桩基础至坡面的距离不小于4倍桩径要求时符合工程实际。 The bearing mechanism of pile group foundation was discussed based on the double pile column foundation. A simplified analysis model was proposed for the interaction between high and steep slope and pile group foundation. The equivalent analysis model of pile group foundation in high and steep slope was also presented. In this analysis model, the pile groups were embedded in rocks with high pile caps and load-bearing on one side. And the calculation method for pile group foundation in high and steep slope was proposed based on structure displacement method with landslide thrust and simplified analysis model considered. The optimum design method for the pile group foundation was also presented with stability and economic optimality considered. The results show that the distance between the bottom of pile cap and dangerous sliding surface should be reduced as small as possible. The rock-embedded depth of 4 times of the pile diameter (4d) can satisfy the engineering demand. When the distance between pile group foundation and slope surface is no less than 4d, it is in accord with the practical engineering.
出处 《中国公路学报》 EI CAS CSCD 北大核心 2014年第10期84-92,共9页 China Journal of Highway and Transport
基金 国家自然科学基金项目(51208063 51278187) 湖南省教育厅科研基金项目(11C0059) 中国博士后科学基金项目(2012M511709) 桥梁工程安全控制省部共建教育部重点实验室开放基金项目(12KB03)
关键词 桥梁工程 群桩基础 受力分析 承载机理 高陡斜坡 设计计算方法 bridge engineering pile group foundation force analysis bearing mechanism high and steep slope design and calculation method
  • 相关文献

参考文献11

二级参考文献106

共引文献690

同被引文献163

引证文献20

二级引证文献77

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部