光照水电站大坝基础处理设计探讨 被引量:1

Discussion on the Design of Dam Foundation Treatment of Guangzhao Hydropower Station
下载PDF
导出
摘要 光照日水电站碾压混凝土重力坝坝基的承载能力及两岸帷幕的防渗能力是大坝基础处理设计的重要环节。结合现场实际情况,提出利用碾压升层间隙进行施工,采用灌前简易压水试验透水率小于1 Lu孔段和已灌孔吸浆量单耗不大于40 kg/m这2个标准对坝基岩石条件进行判定,适当增加灌浆段段长等创新设计思路,提高了工程的施工速度,保证了施工质量。 The carrying capacity of foundation and the seepage control of curtains in left and right banks are important part of the design of dam foundation treatment of the RCC gravity dam in Guangzhao Hydropower Station. Combined with the actual situation, the innovative design ideas are proposed to accelerate the construction of dam, including carried out consolidation grouting of dam foundation between two compacted layer construction, determining foundation rock conditions by using two criteria of the permeability ratio of grouting hole not more than 1 Lu achieved by simple water pressure test before grouting and the grout consumption of grouted hole not more than 40 kg/m, and increasing the depth of grouting holes in some area. These innovative design ideas have accelerated the speed and improved the quality of dam construction.
出处 《水力发电》 北大核心 2014年第12期48-50,58,共4页 Water Power
关键词 碾压混凝土重力坝 基础处理 设计 光照水电站 roller compacted concrete gravity dam foundation treatment design Guangzhao Hydropower Station
  • 相关文献

参考文献3

  • 1宋园生,乔荣梅.龙滩水电站左岸大坝坝基固结灌浆[C]//水工建筑物水泥灌浆与边坡支护技术暨第9次水利水电地基与基础工程学术会议论文集.北京:中国水利水电出版社,2007:101-106.
  • 2王连喜,蔡银春,於习军.岩溶地层防渗帷幕设计和施丁的几个问题[C]//水工建筑物水泥灌浆与边坡支护技术暨第9次水利水电地基与基础工程学术会议论文集.北京:中国水利水电出版社,2007:44-49.
  • 3曹蓓蓓,洪金领.大坝基础灌浆常见问题及处理[J].水力发电,2013,39(7):61-63. 被引量:4

二级参考文献6

共引文献3

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部