地铁盾构隧道整环衬砌结构三维有限元分析 被引量:5

3D FEM Analysis on Metro Shield Tunnel Lining Structures
下载PDF
导出
摘要 利用大型通用有限元软件ABAQUS建立地铁盾构隧道整环衬砌结构的三维有限元模型,计算分析衬砌环在试验荷载工况下的荷载—变形关系曲线、变形过程中隧道管片的内力发展过程;计算分析试验荷载工况下衬砌环直径变形量发展至一定收敛限值时,进行钢板加固,并继续计算完成荷载-变形全过程关系曲线、变形过程中隧道管片的内力发展过程。通过与试验结果的对比分析,有限元计算结果与试验结果两者的变化规律是一致的;计算结果在反映结构应力/应变分布规律方面有重要参考作用。 Three-dimensional FE models of the metro shield tunnel lining structure were established by using ABAQUS.In the simulation load-displacement curves were calculated and analyzed under testing load cases . Internal force development process in the lining structure under different deformations were also analyzed . Load-displacement curves were calculated and analyzed by using finite element modeling of the lining struc -ture , which was strengthened by steel rings when the diameter of the lining structure develops to a certain limit value .The internal force development processes of the strengthened structure under deformation were also ana -lyzed.Comparison between FEM calculation and test results was provided , which shows that FE calculation results are close to test results .
出处 《结构工程师》 北大核心 2014年第5期62-67,共6页 Structural Engineers
基金 上海市科学技术委员会科研计划项目(11231201400)
关键词 地铁盾构隧道 衬砌结构 有限元分析 荷载位移曲线 metro shield tunnel lining structure finite element analysis load-displacement curve
  • 相关文献

参考文献5

二级参考文献17

  • 1钟小春,朱伟,季亚平,徐洋.盾构衬砌管片环弯曲等效刚度的一种确定方法[J].地质与勘探,2003,39(z2):185-189. 被引量:13
  • 2朱伟,钟小春,秦建设.盾构衬砌管片接头力学分析及双直线刚度模型研究[J].岩土力学,2006,27(12):2154-2158. 被引量:48
  • 3陆同寿 崔铁军.圆形衬砌接头刚度模型试验与研究[J].隧道及地下工程,1987,8.
  • 4Teodor I. Design considerations and testing in shield-driven tunnels [ A ]. Towards New Worlds in Tunneling [C].Rotterdam: Balkema A A,1992. 67-80.
  • 5Atsushi K. On the design method of the shield tunnel lining[J]. Science & Engineering, 1992. 125-177.
  • 6日本土木学会编 朱伟译.隧道标准规范(盾构篇)及解说[M].北京:中国建筑工业出版社,2001..
  • 7鲁亮,欧阳冬,兰学平.上海长江隧道衬砌构整环试验研究[C].第17届全国结构工程学术会议论文集(第Ⅱ册),2008.
  • 8曹文宏,陈正杰,杨志豪.超大直径隧道衬砌足尺结构试验研究[J].市政技术,2009,27(增刊2).
  • 9Hiroshi Nakamura, Toshikazu Kubota, Mamoru Furukawa, et al. Unified construction of running track tunnel and crossover tunnel for subway by rectangular shape double track cross-section shield machine [ J ]. Tunnelling and Underground Space Technology, 2003, 18: 253-262.
  • 10Jorg Schreyer, Dieter Winselman. Suitability tests for the lining for the 4th Elbe Tunnel Tube-Results of large-scale Tests [J]. Tunnel, 2000, (1): 34-44.

共引文献149

同被引文献35

引证文献5

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部