期刊文献+

科技开发能力的模糊综合评定 被引量:1

FUZZY SYNTHETICAL EVALUATION OF SCIENTIFIC AND TECHNICAL DEVELOPMENT ABILITY
下载PDF
导出
摘要 本文应用二级模糊综合评判方法,建立了评定科技开发能力的数学模型,合理客观地考虑了影响科技开发能力的多种因素之间相互作用的模糊性。模型简便、实用,不仅给出科技开发能力的最终评定结果,而且能显示出系统中存在的薄弱环节。 In this article a mathematic model of evaluating scientific and technical development ability is established with the method of two degree fuzzy synthetical evaluation. It takes into account the fuzzy of interaction among the various factors affecting scientific and technical developing ability in a reasonable and objective way. Being simple and practical, it not only produces the results of final evaluation of scientific and technical development ability, but also displays the vulnerable spot of the system so that it is convenient for us to take measures in the adjustment of the system.
出处 《运筹与管理》 CSCD 1997年第4期35-42,共8页 Operations Research and Management Science
关键词 科技开发 模糊评定 开发能力 科技管理 :scientific and technical development fuzzy evaluation development ability administiation of seiectific and technique
  • 相关文献

参考文献4

二级参考文献9

  • 1刘锡荟,陈一平,张卫东,汪培庄.建筑物震害预测的落影贝叶斯原理的应用[J]地震工程与工程振动,1985(01).
  • 2刘锡荟,王孟玫.建筑物地震破坏等级的模糊数量化表示方法[J]华北地震科学,1984(03).
  • 3王彩华等.模糊论方法学[M]中国建筑工业出版社,1995.
  • 4金国梁,齐洪波,郭纲平.老旧民房地震破坏预测的方法[J]工程抗震,1985(02).
  • 5刘锡荟,王孟玫.建筑物地震破坏等级的模糊数量化表示方法[J]华北地震科学,1984(03).
  • 6刘锡荟,王孟玫,汪培庄.模糊烈度[J]地震工程与工程振动,1983(03).
  • 7杨玉成,杨柳,高云学,杨亚玲,陆锡蕾,杨桂珍.现有多层砖房震害预测的方法及其可靠度[J]地震工程与工程振动,1982(03).
  • 8王彩华等.模糊论方法学[M]中国建筑工业出版社,1995.
  • 9邓民宪,宋龙伯.地震反应心理的调查与研究[J].中国地震,1991,7(2):86-93. 被引量:4

共引文献1

同被引文献1

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部