摘要
随着生产矿井机械化作业水平大幅度的提升,大型设备的下井作业已成为老矿井运输面临的重大难题,以章村矿四井西大巷运输系统改造为例,对大巷运输系统进行优化方案设计,进行工程效益综合比较分析,提前改造完成了对大巷运输系统的改造,取得了显著的综合效益。
As the production of coal mine mechanization level of operation greatly ascended, large equipment working underground became the problem of old mines, No. 4 shaft of Zhangcun Mine main roadway transportation was taken as an example, roadway transportation system was optimized, project benefit was compared and analyzed, main roadway transportation system was transformed in advance, with remarkable comprehensive benefits.
出处
《煤炭与化工》
CAS
2014年第10期91-93,共3页
Coal and Chemical Industry
关键词
运输系统
改造
综合效益
transportation system
modification
comprehensive benefits