期刊文献+

垂直海洋立管中连续油管载荷传递影响因素分析 被引量:2

Research on the Impacting Factors of Load Transfer for Coiled Tubing within the Marine Vertical Riser
下载PDF
导出
摘要 由于连续油管刚度较小,在海洋复杂环境条件下,导致在下入立管过程中易引起各种事故。因此,需要对这种特殊边界条件下的连续油管力学传递特性进行研究。通过建立连续油管下入海洋立管时的有限元模型,模拟分析了浮动边界下连续油管注入过程中影响载荷传递的因素。分析结果表明:相同工况下,立管刚度越大,内管的轴向力传递效率越高;内外管管径比越小,内管的轴向力传递效率越高。 Because of the stiffness of the coiled tubing is small,and the marine environment is com-plex,it is likely to cause accidents,so it needs to study the axial load transfer characteristics of coiled tubing in the Marine riser.In this paper,through the establishment of coiled tubing down into the marine riser in finite element method,the influence factors on load transfer characteristics of coiled tubing injection under the floating boundary is analyzed.The analysis results show that under the same conditions,the greater the stiffness of the riser is,the higher the axial force trans-mission efficiency of the inner pipe is,the smaller the ratio is,the higher the inner tube axial force transmission efficiency is.
出处 《石油矿场机械》 2014年第12期13-17,共5页 Oil Field Equipment
基金 国家自然科学基金青年科学基金项目(51309237) 中国石油科技创新基金研究项目(2012D-5006-0608) 中国石油大学(北京)引进人才科研启动基金(KYJJ2012-04-18)
关键词 连续油管 海洋立管 载荷传递 有限元分析 coiled tubing marine riser load transfer finite element analysis
  • 相关文献

参考文献10

  • 1王文明,张仕民,陈迎春,王德国,刘书海.连续管在海洋油气作业中的应用[J].石油机械,2012,40(11):53-57. 被引量:4
  • 2陈迎春,张仕民,王文明,李亨涛,张行,杨德福.连续油管屈曲力学特性研究进展[J].石油矿场机械,2013,42(12):15-20. 被引量:11
  • 3LarimoreD,AshwellC,AbidinA H Z.FirstDiverlessSubsea Wireline WellIntervention Performedin Off-shoreVietnamoffersLow-CostSolutionforLightWellWorkovers:Case HistoriesandFutureTrends [C]//SPE AsiaPacificOiland GasConferenceandExhibi-tion.Jakarta,Indonesia;Society of Petroleum Engi-neers.1999.
  • 4Kenawy F A,Ellaithy W F.Casehistoryin CoiledTubing Pipeline [C]//Offshore Technology Confer-ence.Houston,Texas.1999.
  • 5Ponsonby M,McClellanN,LigertwoodJ.CoiledTub-ingin High-Pressure/High-Temperature Wells-Tech-nicalEnhancementsintheNorthSea [C]//SPEICo-TA Coiled Tubing Conferenceand Exhibition.Hous-ton,Texas;2002,.Society of Petroleum EngineersInc.2002.
  • 6KaleSV,ProctorRJ,PaliwalSK,NayakSK.Opera-bilityChallengesDuringCoiled-Tubing (CT)WellIn-tervention:PannaFieldCase HistoriesFrom WesternIndiaOffshore[C]//SPEICoTA CoiledTubingCon-ference & Exhibition.The Woodlands,Texas,USA;SocietyofPetroleum Engineers.2006.
  • 7Razak M H A,Wibisono R,Yusoff M N A.BargeMounted Coil Tubing-An Operational Safety CaseStudyinSouthChinaSea[C]//NorthAfricaTechni-calConferenceandExhibition.Cairo,Egypt;SocietyofPetroleum Engineers.2010.
  • 8LaunLE,Ovesen M,VarhaugH,NesvikK T.World'sFirstUtilizationofCoiledTubingtoDissolveHydrate(s)inanFPSO Riser:CaseHistory[C]//SPEICoTACoiledTubingConferenceandExhibition.The Wood-lands,Texas;SocietyofPetroleum Engineers.2005.
  • 9QuinteroI,MurphyR A,MaddoxJ,NoddinJ,ColesRA.UniqueApplicationofCoiledTubingandInflatablePacker Technology Leadsto Successful Deoiling ofDamagedPipelineinGulfofMexico[C]//SPEICoTACoiled Tubingand WellIntervention ConferenceandExhibition.The Woodlands,Texas,USA;Society ofPetroleum Engineers.2008.
  • 10NellessenP.SS:Subsea WellIntervention:Develop-mentofaDeepwaterSubsea WellInterventionPack-ageControlSystem [M].2010.

二级参考文献56

  • 1刘峰,王鑫伟.水平井中钻柱屈曲的非线性有限元分析[J].机械科学与技术,2005,24(8):917-920. 被引量:10
  • 2林铁军,练章华,刘健,李东亮,吕其军.连续油管正弦屈曲载荷新公式及有限元模拟[J].石油机械,2007,35(9):32-34. 被引量:9
  • 3Baklid A, Apeland O J, Teigen A S. CT ESP for Yme, converting the Yme fiehl offshore norway from a conven- tional rig-operated field to CT-operaled for workover and drilling applications [C] //SPE/ICoTA Coiled Tubing Roundtable. Houston, Texas; Copyright 1998, Society of Petroleum Engineers Inc, 1998.
  • 4Geddes M J, Deady A, Speagell M, et al. Real-time onshore control center enables offshore personnel reduction in coiled-tubing managed-prcssure drilling operation [C]//IADC/SPE Managed Pressure Drilling & Underbalanced Operations. Galveston, Texas, U. S. A. ; 2007 IADC/SPE Managed Pressure Drilling and Underbalanted Operations Conference and Exhibition, 2007.
  • 5Larimore D, Ashwell C, Abidin A H Z. First diverless subsea wireline well intervention performed in offshore vietnam offers low-cost solution for light well workovers: case histories and future trends [ C] //SPE Asia Pacific Oil and Gas Conference and Exhibition. Jakarta, Indonesia; Society of Petroleum Engineers, 1999.
  • 6Kenawy F A, Ellaithy W F. Case history in coiled tubing pipeline [ C]//Offshore Technology Conference. Houston, Texas, 1999.
  • 7Ponsonby M, McClellan N, Ligertwood J. Coiled tubing in high-pressure/high-temperature wells-technical en- hancements in the north sea [ C] //SPE/ICoTA Coiled Tubing Conference and Exhibition. Houston, Texas; 2002, Society of Petroleum Engineers Inc, 2002.
  • 8Kale S V, Proctor R J, Paliwal S K, et al. Operability challenges during coiled-tubing (CT) well intervention : panna field case histories from western india offshore [C]//SPE/ICoTA Coiled Tubing Conference & Exhibition. The Woodlands, Texas, USA ; Society of Petroleum Engineers, 2006.
  • 9Razak M H A, Wibisono R, Yusoff M N A. Barge mounted coil tubing-afety case study in south china sea [ C] //North Africa Technical Conference and Exhibition. Cairo, Egypt ; Society of Petroleum Engineers, 2010.
  • 10Laun L E, Ovesen M, Varhaug H, et al. World's first utilization of coiled tubing to dissolve hydrate ( s ) in an FPSO riser: case history [C]//SPE/ICoTA Coiled Tubing Conference and Exhibition. The Woodlands, Texas ; Society of Petroleum Engineers, 2005.

共引文献12

同被引文献10

引证文献2

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部