摩根早期高速线材打捆机存在着许多设计上的缺陷或不足,稳定性差,严重影响到车间的生产。因此针对于摩根早期线材打捆机原有的设计缺陷或不足,有针对性的对打捆机各个系统进行优化设计,弥补原设计存在的不足,确保车间的稳定生产。
Morgan early high-speed wire bundling machine has many defects or deficiencies in design.It's poor stability seriously affects the workshop production.So targeted optimization design of each system for Morgan early wire bundling machine has been maden to make up for the shortage of the original design to ensure the stability of the workshop production.
出处
《机电产品开发与创新》
2014年第6期76-77,56,共3页
Development & Innovation of Machinery & Electrical Products
关键词
摩根早期线材打捆机
设计缺陷
优化设计
morgan early wire bundling machine
defect in design
optimization design