摘要
目前我国水电站冲击式水轮机正向着大容量、多喷嘴的方向发展,为适应发展需要,冲击式水轮机组调速器应运而生。本文重点对水电站冲击式水轮机组调速器技术发展历程进行探讨。
At present,pelton turbine of hydropower station is designed to the direction of large-capacity and multi-nozzle in China. Pelton turbine unit speed governor is produced as a result in order to meet development needs. In the paper,technical development process of hydropower station pelton turbine speed governor are mainly discussed in the paper.
出处
《中国水能及电气化》
2014年第11期45-47,44,共4页
China Water Power & Electrification
关键词
水电站
冲击式水轮机
调速器
技术发展历程
hydropower station
pelton turbine
speed governor
technology development process