分析了矿焦槽及转运站除尘系统存在的问题,对矿焦槽槽上卸料小车、矿焦槽槽下、转运站内部、除尘管网进行了改造,取得了良好的除尘效果。
The problems of dedusting system of ore and coke tank and transfer station were analyzed. The discharge trolley where above the ore and coke tank, the below of the ore and coke tank, and the dedusting piping were transformed.The good dust removal effect was obtained.