摘要
工程建设期间,受突风影响,施工船与已建成的码头承台发生碰撞,造成承台下方钢管桩受损,根据现场检测及水下探摸情况,通过专家多次商讨方案,制定了补强措施,实施后效果良好。
Being affected by gust,a work-boat impacted the completed wharf platform in construction period, which damages the steel-pipe piles under the platform. According to site inspection and submarine detection results, rehabilitation option was discussed by experts time after time,the repairing and reinforcing measures were determined finally.
出处
《港工技术》
2014年第5期45-48,共4页
Port Engineering Technology
关键词
承台
钢管桩
措施
cushion platform
steel-pipe pile
measures