通过湄洲湾内某30万t级原油码头的工程实践,介绍了在孤岛作业、复杂地质条件环境下高桩墩式结构斜桩嵌岩成孔的施工工艺,并对施工过程中存在的问题进行了分析。
Meizhou Bay 300 000 DWT crude oil terminal project is based on to introduce the pore-forming technology of rock-socketed raking pile for high pile pier foundation under the conditions of complex geology and island operation. The problems occurred in the construction is also analyzed.