摘要
水利水电工程泄水建筑物泄水雾化对临近建筑物和电气设备的影响,至今仍是水利水电工程建设中一个尚待完全攻克的难题,且由于各工程情况不一,表现出的影响程度、解决的难度等不尽相同。结合戈兰滩水电站工程的实际情况,在充分总结国内相关水电站的经验和教训的基础上,对戈兰滩水电站电气设备选型和设备布置,进行了较深入地分析和研究,并采取了一系列防御措施,防止和降低泄水雾化对电气设备的影响。
The influence of discharge atomization of water release structure on adjacent buildings and electrical equipment is still a problem yet to be completely overcome in the construction of water conservancy project,and since the conditions of all projects are different,the influence degree and difficulty of solving problems are also different.In combination with the actual conditions of Celantan hydropower station,this text makes a profound analysis and study on electrical equipment selection and layout based on the experience and lessons of domestic relevant projects,and a series of protection measures are taken to prevent and reduce the influence of discharge atomization on electrical equipment.
出处
《水利水电工程设计》
2014年第4期27-29,共3页
Design of Water Resources & Hydroelectric Engineering
关键词
戈兰滩水电站
泄洪水雾
电气设备
220
KV
GIS
gelantan hydropower station
flood discharge water fog
electrical equipment
220 kV
GIS