期刊文献+

桂北某铀矿采矿方法的优化改进 被引量:1

Optimization and improvement of mining method for a northern Guangxi uranium mine
下载PDF
导出
摘要 针对桂北某铀矿在采用分层分段进路法回采矿体时存在的采场通风效果差、采掘原材料消耗较大等问题,根据矿体赋存条件,对回采方法做了优化改进,即采用上向水平分层干式充填法回采矿体。实践表明,采场平均生产能力比原回采方法提高了15t/d,原材料消耗有所下降,采场本质安全度明显提高。 Aimed at the problems of poor ventilation effect of stope and high consumption of raw mate- rial in digging process in a northern Guangxi uranium mine by using slicing-and sublevel drift stoping method, and according to ore body occurrence condition, optimization and improvement were made for ore winning technology, and toward horizontal slice cut-and filling stopping method was used to min- ing ore body. Practice indicates that average productive capacity of stope is increased by 15 t/d com- pared with original stopping method, raw material consumption is reduced and intrinsic safety at stope is obviously enhanced.
出处 《铀矿冶》 CAS 2014年第4期175-177,191,共4页 Uranium Mining and Metallurgy
关键词 铀矿床 充填采矿法 采矿工效 回采工艺 优化 uranium ore deposit cut-and filling stoping method mining efficiency ore winning tech-nology optimization
  • 相关文献

参考文献4

二级参考文献4

共引文献29

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部