期刊文献+

山体洞式电梯竖井设计 被引量:1

Design of Mountain Cave Elevator Shaft
下载PDF
导出
摘要 山体洞式电梯竖井施工为大断面竖井工程,需要隧道、建筑、电气多专业联合设计,目前国内山体洞式电梯竖井工程成功案例较少,可借鉴经验不多。结合文成县百丈漈景区洞式电梯竖井工程,对山体洞式电梯竖井工程分别从设计技术标准的采用、内轮廓尺寸的拟定、竖井支护参数选择、井内建筑结构设计、施工方案各角度进行了论述,为今后类似的山体竖井设计提供借鉴。 Mountain cave elevator shaft construction is a large cross section shaft engineering, it needs multiple joint professional design of tunnel, construction, electric. At present, there are few projects of mountain cave elevator shaft in China which can barely provide no experience. Based on the project of cave elevator shaft engineering in Baizhangji scenic in Wencheng County, the article discusses the design technical standards, the inner contour dimension, shaft support parameters, construction structural design and construction plan of mountain cave elevator shaft, in order to provide some reference for similar design in future.
出处 《交通标准化》 2014年第22期66-69,共4页 Communications Standardization
关键词 竖井 洞式电梯竖井 隧道竖井 大断面竖井 shaft cave elevator shaft tunnel shaft large cross-section shaft
  • 相关文献

参考文献6

  • 1JTGD70—2004.公路隧道设计规范[S].[S].,..
  • 2JTG/T D70—2010,公路隧道设计细则[S]..
  • 3JTGF60—2009,公路隧道施工技术规范[S].
  • 4JTG/TF60—2009,公路隧道施工技术细则[S]..
  • 5GB50352—2005,民用建筑设计通则[S].
  • 6GB50016—2006建筑设计防火规范[S]

共引文献61

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部