大采高综采工作面快速安装技术 被引量:1

The fast installation technology of fully mechanized mining face with large mining height
下载PDF
导出
摘要 综采工作面设备重型化发展,对设备的安装技术提出新的要求,尤其是大采高综采工作面设备安装一直困扰着煤炭生产,通过实践和不断探索,采用大功率无轨胶轮车快速运输,统筹安排,优化工序,实现工作面设备的多工序交叉平行快速安装,能有效缩短工期,降低安全风险。实践表明:该技术具有较好的可靠性和安全性,解决了大采高综采工作面设备快速安装难题。 With the development of heavy equipments in fully mechanized mining face, the new requirements for equipments installation are improved, especially fully mechanized mining face with large mining height. Through practice and continuous exploration, u- sing high-power trackless tyred vehicle for equipment transportation, the fast installation of mining equipments is implemented, the con- struction period is shorted effectively and the safety risk is reduced. The practice shows that the technology has a good safety and relia- bility and can solve the fast installation problem of equipments in fully mechanized mining face with large mining height.
出处 《陕西煤炭》 2014年第5期75-77,共3页 Shaanxi Coal
关键词 大采高 综采工作面 设备 安装 large mining height fully mechanized mining face equipments installation
  • 相关文献

参考文献6

二级参考文献9

共引文献42

同被引文献4

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部