摘要
本文详细地论述了SZ 36—1油田生产试验区AⅡ导管架在钻丛式井组过程中所采用的技术措施,并有选择地进行了分析。在实践的基础上,指出了该技术所存在的问题及改进措施。对今后钻SZ 36—1油田的其它开发井具有一定的参考价值。
This paper gives a detailed description of technical measures used in the process of drilling cluster wells on jacket platform A II of SZ 36 - 1 Oil Field in the production test area and selectively analyzes the above measures. The existing technical problems have been pointed out, and the steps should be taken for future improvement on the basis of practice. It's referential to drilling other development wells of SZ 36- 1 Oil Field.
出处
《中国海上油气(工程)》
1991年第4期45-51,共7页
China Offshore Oil and Gas
关键词
丛式井组
钻井技术
泥浆
固井
cluster wells of SZ 36- 1 Oil Field, drilling technique, drilling mud, cementing technique