摘要
地铁盾构加压开仓换刀施工是地铁盾构施工中的重点和难点,对施工中的质量安全控制提出较高要求。本文以福州地铁工程为实例,着重从开仓前准备、开仓进仓过程等几方面分析了施工中的质量安全控制要点,为今后地铁盾构施工遭遇类似的情况提供参考借鉴。
Fixing the cutter bit in cutter chamber with pressure is a high technical content in the construction of the subway. It needs to carry out most strict quality and safety management. This article focuses on preparation before construction and the construction process in fixing the cutter bit with quality and safety management. hope to provide a reference for the similar situation.
出处
《福建建筑》
2014年第11期64-66,共3页
Fujian Architecture & Construction
关键词
地铁盾构
加压开仓
质量安全控制
The subway shield tunneling
Work in cutter chamber with pressure
The quality and safety management