海洋钻井成本控制方法及钻井作业时间测算 被引量:3

Control of Offshore Drilling Cost and Time Estimate of Drilling Operation
下载PDF
导出
摘要 海洋钻井成本受多种因素影响。本文由招标、制定和实施合同、作业进程中的调度以及计算日费率等方面总结了控制海洋钻井成本的途径和应采取的措施。依据50口井资料的分析,介绍了如何对钻井作业中的生产、电测、取芯、试油、气候停工等时间的预测。并举例说明了钻井作业时间的具体测算方法。 Offshore drilling cost is affected by many factors. This papsr suincrizes the control effective way of offshore drilling cost and measures taken in bidding, formulating and implementing contract, adjustment in operation, and calculating the daily cost etc. the estamate is presented of drilling production, logging, coring well-testing, and shut-down because of weather conditions based on the analysis of information from 50 wells. The specific time estimate of drilling operation is illustrated with examples.
作者 林广辉
出处 《中国海上油气(工程)》 1991年第5期63-70,共8页 China Offshore Oil and Gas
关键词 海洋钻井 钻井 成本 时间 计算 offshore drilling drilling cost control drilling time calculation
  • 相关文献

同被引文献35

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部