上游水电站调蓄下施工导流风险效益分摊模型 被引量:3

Construction diversion risk benefit sharing model based on water diversion and storage at upstream hydropower station
下载PDF
导出
摘要 为有效地均衡上、下游水电站与调峰电站之间的风险并合理分摊合作效益,将上游水电站汛期调蓄过程对导流系统和调峰电站引起的成本收益看作一种合作性的风险效益,运用合作博弈中的最小核心法建立梯级水电站建设条件下的导流风险效益分摊最小核心模型,求解梯级水电站建设条件下施工导流风险效益的分摊额度。实例计算结果表明:由于下游水电站施工导流系统和抽水蓄能电站受惠于上游水电站的调蓄作用,其分摊结果为负值,需支付上游水电站补偿金;不同的导流标准使分摊额度在梯级水电站群与调峰电站之间转移。 In order to effectively balance the risks of upstream and downstream hydropower stations and the peak load dispatching hydropower station, and reasonably share their benefits, we considered the effects of flood regulation and the storage process of the upstream station as a cooperative risk benefit and used the least core method in cooperative games to establish a least core model of diversion risk benefit sharing under the conditions of the construction of cascade hydropower stations, in order to calculate the diversion risk benefit sharing quota. A case study shows that the sharing of the diversion system and the pumped storage hydropower station exhibited negative values due to the benefits from the water diversion and flood storage at the upstream station, which means that we need to compensate the upstream hydropower station. The sharing of expenses of all the three hydropower stations varied with the change of diversion standards.
作者 刘潋 胡志根
出处 《河海大学学报(自然科学版)》 CAS CSCD 北大核心 2014年第6期559-564,共6页 Journal of Hohai University(Natural Sciences)
基金 国家自然科学基金(51279137,51079115)
关键词 施工导流 风险效益分摊 合作博弈 梯级水电站 construction diversion risk benefit sharing cooperative game cascade hydropower station
  • 相关文献

参考文献16

二级参考文献52

共引文献57

同被引文献42

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部