摘要
介绍了三峡地下电站30号机进行无水整体耐压试验的情况,试验中发现绝缘盒本体存在的缺陷,提出了绝缘盒现场更换的措施,对新换的绝缘盒进行了耐压试验,结果满足设计要求。
In the waterless whole dielectric strength test of No .30 generator unit in the underground plant of Three Gor-ges hydropower station , defect is found in the body of insulation box .Treatment measures are proposed to replace the in-sulation box in-situ.Dielectric strength test shows a satisfying performance of the replaced box .
出处
《水电与新能源》
2014年第11期56-58,共3页
Hydropower and New Energy
关键词
三峡地下电站
绝缘盒
耐压试验
underground plant of Three Gorges hydropower station insulation box dielectric strength test