期刊文献+

考虑机器检修的圆钢热轧批量调度算法 被引量:5

Hot-rolling batch scheduling algorithm for round steel production with machine repair
下载PDF
导出
摘要 针对圆钢的热轧批量调度问题,考虑实际生产中的机器检修计划对批量连续性加工的影响,以最大化产能利用率、最小化机器调整时间和订单提前拖期为优化目标,建立了多目标的整数规划模型,并提出改进的带精英策略的快速非支配排序算法对模型进行求解。算法结合问题的约束特征,采用改进的NEH算法生成初始解,并采用罚函数的思想设计适应度函数,对种群中存在的不合理解设计修复规则进行修复;针对遗传进化过程,设计了遗传操作方式,并在算法迭代过程中嵌入基于有限搜索范围的邻域搜索算法,避免算法陷入局部最优。实验结果表明,模型和算法对问题的描述和求解是可行有效的。 Aiming at the hot-rolling batch scheduling of round steel, the influence of machine repair planning on con- tinuous batch rolling was considered. A multi-objective integer programming model was built with the objectives to maximize the rate of capacity utilization and minimize the setup times and earliness/tardiness of orders, and a modified Non-dominated Sorting Genetic Algorithm Ⅱ (NSGA-Ⅱ) was proposed to solve the model. Combined with the model's constraint feature, the initial solution was generated by modified NEH algorithm. A fitness function was designed with the thought of penalty function, and some rules were proposed to repair the unreasonable solution in the population. Aiming at the genetic progress, the genetic operation method was created, and a local search algorithm based on limited search scope was embedded in the iteration to avoid a local optimum. Experiment results showed that the proposed model and algorithm were feasible and effective.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2014年第10期2502-2511,共10页 Computer Integrated Manufacturing Systems
基金 教育部博士学科点专项科研基金资助项目(20100006110006) 中央高校基本科研业务费专项资金资助项目(FRF-SD-12-011B FRF-SD-12-012B) 国家自然科学基金资助项目(70771008)~~
关键词 热轧批量调度 多目标优化 带精英策略的快速非支配排序算法 遗传算法 圆钢生产 hot-rolling batch scheduling multi-objective optimization non-dominated sorting genetic algorithm Ⅱ genetic algorithms round steel production
  • 相关文献

参考文献14

  • 1李铁克,郭冬芬.基于约束满足的热轧批量计划模型与算法[J].控制与决策,2007,22(4):389-393. 被引量:18
  • 2张文学,李铁克.面向多种生产工艺的冶铸轧一体化批量计划优化[J].计算机集成制造系统,2013,19(6):1296-1303. 被引量:10
  • 3PAN C C,YANG G K.A method of solving a large scale rolling batch scheduling problem in steel production using a variant of column generation[J].Computers & Industrial Engineering,2009,56(1):165-178.
  • 4JIA S J,YI J,YANG G K,et al.A multi-objective optimization algorithm for the hot roiling batch scheduling problem[J].International Journal of Production Research,2013,51(3):667-681.
  • 5TANG L X,HUANG L.Optimal and near-optimal algorithms to rolling batch scheduling for seamless steel tube production[J].International Journal of Production Economics,2007,105(2):357-371.
  • 6李琳,霍佳震.钢管生产计划中的多目标柔性Job-shop调度问题[J].系统工程理论与实践,2009,29(8):117-126. 被引量:21
  • 7SHI C T,YANG G J,LIT K.An evolutionary neighborhood search algorithm for flexible job-shop scheduling problem in steel tube production[J].Advanced Materials Research,2012,566:620-627.
  • 8ASAD R,DEMIRLI K.Production scheduling in steel rolling mills with demand substitution:Rolling horizon implementation and approximations[J].International Journal of Production Economics,2010,126(2):361-369.
  • 9王欣,阳春华,秦斌.棒线材轧制批量调度多目标混合优化[J].控制与决策,2006,21(9):996-1000. 被引量:8
  • 10DEB K,PRATAP A,AGARWAL S,et al.A fast and elitist multiobjective genetic algorithm:NSGA-Ⅱ[J].IEEE Transactions on Evolutionary Computation,2002,6(2):180-197.

二级参考文献70

共引文献75

同被引文献29

引证文献5

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部