成都市二环路红牌楼立交引桥整体顶升关键技术 被引量:6

The Key Entire Jacking Technology of Hongpailou Interchange Approach Bridge in Chengdu Second Ring Road
下载PDF
导出
摘要 根据成都市红牌楼立交桥整体顶升施工技术实践,对交替式顶升施工技术方案进行了可行性研究,阐明了整体顶升技术、顶升施工过程中钢支撑托架系统、限位系统及正式顶升关键工序等重要环节的关键施工技术要点,最终顺利安全实现了桥梁整体顶升施工。工程实践说明:采用交替式顶升方案,能消除顶升时因千斤顶失效而出现的安全隐患,保证整个顶升过程中安全可靠。 According to the construction practice of entire jacking of Chengdu Hongpailou interchange approach bridge, feasibility study on alternating jacking construction scheme is performed, the key technical points of jacking construction process are introduced such as entire jacking technology, bracket system, limiting location system and the formal lifting technology. The entire jacking construction of bridge strengthening is fulfilled smoothly. Engineering practice shows that alternating lifting construction can eliminate the emergence security risks due to the jack lifting failures, ensure the entire lifting process safe and reliable.
作者 刘长卿
出处 《施工技术》 CAS 北大核心 2014年第22期99-103,共5页 Construction Technology
关键词 桥梁工程 加固 顶升 施工技术 bridges reinforcements jacking construction
  • 相关文献

参考文献11

二级参考文献3

  • 1吴定安.上海音乐厅抬升和平移工程[J].流体传动与控制,2005(4):33-35. 被引量:7
  • 2JTG/TJ22-2008公路桥梁加固设计规范[S].北京:人民交通出版社,2008.
  • 3JTG/TJ23-2008公路桥梁加固施工技术规范[S].北京.人民交通出版社,2008.

共引文献421

同被引文献24

引证文献6

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部