某三跨连续梁桥整体提升研究 被引量:6

The Study of One Three Span Continuous Beam Bridge Integral Lifting
原文传递
导出
摘要 某大桥主桥为一座三跨连续梁桥,需要整体提升3m,主要介绍了顶升系统的工作原理、施工过程以及桥梁顶升时相应的监测情况。为了保证分级顶升的安全性和控制标准,我们建立了三维有限元模型,对其变形和应力分布特征进行了模拟,得到了理论上的控制阀值。根据理论分析成果,该三跨连续梁桥得以成功顶升,本工程的成功实施对类似工程有很强的参考价值。 There is one three span continuous girder bridge which needs to be integral improved 3m. This paper mainly introduces the the working principle of lifting system, construction progress and the bridge jacking corresponding monitoring. In order to ensure the safety of successive lifting and control standards, we establish the three-dimensional finite element model to simulate the jacking bridge deformation, stress distribution characteristics and the control threshold in theory. According to the theoretical analysis results, the three span continuous girder bridge was successfully lifted and the successful implementation of the project has very strong reference value to the similar engineering.
出处 《公路》 北大核心 2014年第2期27-32,共6页 Highway
关键词 连续梁桥 整体顶升 有限元模拟 施工监控 continuous bridge integral lifting finite element analysis construction monitoring
  • 相关文献

参考文献6

  • 1郑洪涛.既有桥梁顶升过程监测和数值模拟分析[D].哈尔滨:东北林业大学,2012.
  • 2Ramey G E. lift system for raising continuous concrete bridges[J]. Transp Eng, 1983,109 (5), 733 - 746.
  • 3韩振勇,张振学,杨江国.桥梁顶升技术在旧桥改造工程中的应用//第十七届全国桥梁学术会议,2006.
  • 4李围.ANSYS土木工程应用实例[M].北京:中国水利水电出版社,2007.
  • 5林刚,徐长节,刘耿耿,曹玉泉.湖州市南林大桥整体顶升可行性分析[J].城市道桥与防洪,2010(7):45-47. 被引量:7
  • 6赵阳,项贻强.湖州岂风桥整体顶升施工及监控[J].公路,2008,53(10):13-17. 被引量:13

二级参考文献6

共引文献104

同被引文献33

  • 1汪学谦,汪晓岚,蓝戊己.PLC控制液压同步顶升系统在连续钢箱梁悬臂架设施工中的应用[J].世界桥梁,2005,33(2):33-35. 被引量:61
  • 2韩振勇,张振学,张玉明,侯清,金树法,井润胜.桥梁改造工程中同步顶升技术的应用[J].中国市政工程,2007(1):24-25. 被引量:41
  • 3TBl0002.3-2005,铁路桥涵钢筋混凝土和预应力混凝土结构设计规范[s].
  • 4CHEN Zhou, YAN Quan-sheng, JIA Bu-yu, et al. Large Span Continuous Girder Bridge Jacking Steel Hoop Stress Analysis [J]. Advanced Materials Re- search, 2013, (4): 991--995.
  • 5ZHAO Y, WANG J F, PANG M. Integral Jacking-up Project of the Qifeng Bridge[J]. Journal of Perform- ance of Constructed Facilities, 2012, (26) .. 353--361.
  • 6段中星.北江大桥引桥同步顶升施工若干关键技术研究(硕士学位论文)[D].广州:华南理工大学,2012.
  • 7桂学矫梁顶升技术研究[D].西安:长安大学,2005.
  • 8Pyrke J FS.Underpinning famingj acking-up and moving brick and stone masonry structures.Proceedings of ICE Conference.London. 1982.
  • 9Ramey GE.Lift systemforraisingcontinuousconcretebridges[J]. Transp Eng, 1983,109(5 ):733 -746.
  • 10王嵘,邓锐.乌尔特沟大桥肋式桥台加固改造措施[J].内蒙古公路与运输,2008(1):23-24. 被引量:1

引证文献6

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部