期刊文献+

复杂机械产品多准则预防性维护设计(英文) 被引量:1

Multi-principle preventive maintenance: a design-oriented scheduling study for mechanical systems
原文传递
导出
摘要 研究目的:为复杂机械产品提供满足整机可靠性指标和维护成本指标的预防性维护方案多准则规划方法。创新要点:1.分析了检查、维修、更换等对复杂机械产品零部件工作寿命变化的作用机理;2.提出了复杂机械产品预防性维护多准则规划方法。研究方法:1.基于非完美维修理论,建立不同模式下零件间工作寿命模型,定义维修效能因子,表征检查、维修、更换对零件寿命的影响;2.通过求解获得复杂机械产品指定时间区间的预防性维护方案,根据零部件工作寿命,采取维修和更换等预防性维护措施,减少零部件故障的发生。重要结论:零部件的预防性维护次数与其故障因子相关;机械产品尤其是复杂机械产品实施定期预防性维护能够减少或消除故障的发生。 Preventive maintenance (PM) is very important for the safe, efficient, and reliable operation of mechanical systems. This paper focuses on one of the most challenging tasks for PM:PM scheduling. Two basic principles are integrated to support the PM scheduling of mechanical systems:(1) the cost principle, and (2) the reliability principle. These two PM scheduling principles are regarded as conflicting objectives, and the improved strength Pareto evolutionary algorithm is used to find the Pareto-optimal set within which the best compromise solution can be obtained according to fuzzy set theory. Both conceptual and mathematical models of the proposed multi-principle PM scheduling method are explained, and a case study is provided to illustrate the practical application of the new method.
出处 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2014年第11期862-872,共11页 浙江大学学报(英文版)A辑(应用物理与工程)
基金 project supported by the National Natural Science Foundation of China(Nos.51205347 and 51322506) the Zhejiang Provincial Natural Science Foundation of China(No.LR14E050003) Project of National Science and Technology Plan(No.2013IM030500) the Fundamental Research Funds for the Central Universities the Innovation Foundation of the State Key Laboratory of Fluid Power Transmission and Control the Zhejiang University K.P.CHAO’s High Technology Development Foundation,China
关键词 预防性维护 多准则优化 工作寿命 Preventive maintenance (PM) scheduling Multi-objective optimization Mechanical system
  • 相关文献

参考文献31

  • 1Abido, M.A., 2006. Multiobjective evolutionary algorithms for electric power dispatch problem. Evolutionary Computa- tion, IEEE Transactions on, 10(3):315-329. [doi:10. 1109/TEVC.2005.857073].
  • 2Ahmad, R., Kamaruddin, S., 2012. An overview of time-based and condition-based maintenance in industrial applica- tion. Computers & Industrial Engineering, 63(1):135- 149. [doi: 10A016/j.cie.2012.02.002].
  • 3Alardhi, M., Hannam, R.G., Labib, A.W., 2007. Preventive maintenance scheduling for multi-cogeneration plants with production constraints. Journal of Quality in Maintenance Engineering, 13(3):276-292. [doi: 10.1108/ 13552510710780294].
  • 4Andersson, J., 2001. Multi-objective Optimization in Engi- neering Design: Applications to Fluid Power Systems. PhD Thesis, Division of Fluid and Mechanical Engi- neering Systems, Department of Mechanical Engineering, Linkopings University, Sweden.
  • 5Bartholomew-Biggs, M., Christianson, B., Zuo, M., 2006. Optimizing preventive maintenance models. Computa- tional Optimization and Applications, 35(2):261-279. [doi:10.1007/s10589-006-6449-x].
  • 6Cassady, C.R., Kutanoglu, E., 2005. Integrating preventive maintenance planning and production scheduling for a single machine. Reliability, IEEE Transactions on, 54(2): 304-309. [doi: 10.1109/TR.2005.845967].
  • 7Chakraborty, I., Kurnar, V., Nair, S.B., et al., 2003. Rolling element bearing design through genetic algorithms. En- gineering Optimization, 35(6):649-659. [doi:10.1080/ 03052150310001624403].
  • 8Chung, S.H., Lau, H.C., Ho, G.T., et al., 2009. Optimization of system reliability in multi-factory production networks by maintenance approach. Expert Systems with Applications, 36(6):10188-10196. [doi: 10.1016/j.eswa.2008.12.014].
  • 9Ebrahimipour, V., Najjarbashi, A., Sheikhalishahi, M., 2013. Multi-objective modeling for preventive maintenance scheduling in a multiple production line. Journal ofln- telligent Manufacturing, p.l-12. [doi:10.1007/s10845- 013-0766-6].
  • 10El-Ferik, S., Ben-Daya, M., 2006. Age-based hybrid model for imperfect preventive maintenance. IIE Transactions, 38(4):365-375. [doi:10.1080/07408170500232545].

同被引文献5

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部