摘要
这篇论文集中于与一个帮助 DP 的绳索系统装备的一个半能沉入水中的平台的研究。基于帮助 DP 的绳索系统的工作原则和平台运动的模型,一个时间域模拟程序被使用分析影响在一线失败的情况中,在平台运动上,驱动推进器和系在的线的紧张的消费。结果显示出那,在 10 年的风下面主导,一线失败几乎没在系在的线的紧张上有很少影响。当失败线是上风的时,电源消费将与精确性的一个削弱的位置极大地增加。然而失败线是什么时候下风,电源消费将与精确性的一个部分加强的位置被减少。
This paper focuses on the research of a semi-submersible platform equipped with a DP-assisted mooring system. Based on the working principles of the DP-assisted mooring system and the model of the platform motion, a time domain simulation program is applied to analyze the impact, in the case of one line failure, on the platform motion, power consumption of the thrusters and the tension of the mooring lines. The results show that, under the 10-year wind dominant, a one line failure will have little impact on the tension of the mooring lines. When the failure line is windward, the power consumption will increase greatly with a weakened position of accuracy. However when the failure line is leeward, the power consumption will be reduced with a partly strengthened oosition of accuracy.
基金
Suppirted by the Programme of Introducing Talents of Discipline to Universities(B07019)