期刊文献+

基于多目标殖民竞争算法的随机型双边装配线 被引量:9

Balancing stochastic two-sided assembly line with multi-objective colonial competitive algorithm
下载PDF
导出
摘要 针对随机型双边装配线平衡问题所特有的操作方位约束、位置约束、区域约束和同步约束,以最大化线效率、最小化平滑指数和最小化单位产品总成本为目标,构建了考虑多约束、多目标的数学模型。提出了一种新型的多目标混合殖民竞争算法求解该模型,设计了相应的帝国初始化、帝国内的同化、殖民竞争等操作,并将殖民竞争算法的全局搜索能力与延迟接受爬山算法的局部搜索能力有机结合,以更快获得更优的Pareto解。通过具体实例测试,并将结果与当前文献和快速非支配排序遗传算法进行比较,验证了所提算法的可行性和有效性。 In view of the special additional constraints such as operational direction constraints, positional con- straints, zoning constraints and synchronous constraints in the widespread stochastic two-sided assembly line balan- cing problem, the multi-objective and multi-constraints mathematical model aiming at the Line Efficiency (LE), the minimization of Smoothness Index (SI) and the minimization of Total relevant costs per product unit (Tcost) was built. A novel Multi-Objective Hybrid Colonial Competitive Algorithm (MOHCCA) which combined the global search ability of Colonial Competitive Algorithm (CCA) with the local search ability of Late Acceptance Hill-Climb- ing (LAHC) algorithm was proposed to get better Pareto-solutions and the corresponding procedure of empire ini- tialization, empire assimilation and colonial competitive was designed for solving the balancing problem. Cases re- sults on the benchmark problems compared with the ones presented in the current literature and fast elitism Non- dominated Sorting Genetic Algorithm (NSGA-II) validated the effectiveness of the proposed algorithm.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2014年第11期2774-2787,共14页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金重点资助项目(51035001) 国家自然科学基金资助项目(51275190) 国家863计划资助项目(2012AA040909)~~
关键词 随机型双边装配线 多约束 多目标混合殖民竞争算法 PARETO解集 stochastic two-sided assembly line multiple constraints multi-objective hybrid colonial competitive al-gorithm Pareto sets
  • 相关文献

参考文献20

  • 1张则强,程文明,钟斌,王金诺.求解装配线平衡问题的一种改进蚁群算法[J].计算机集成制造系统,2007,13(8):1632-1638. 被引量:36
  • 2吴尔飞,金烨,续爱民,胡小锋.基于改进遗传算法的双边装配线平衡[J].计算机集成制造系统,2007,13(2):268-274. 被引量:18
  • 3BARTHOLDI J J.Balancing two-sided assembly lines:A case study[J].International Journal of Production Research,1993,31(10):2447-2461.
  • 4KIM Y K,KIM Y,KIM Y J.Two-sided assembly line balancing:a genetic algorithm approach[J].Production Planning & Control,2000,11(1):44-53.
  • 5LEE T O,KIM Y,KIM Y K.Two-sided assembly line balancing to maximize work relatedness and slackness[J].Computers & Industrial Engineering,2001,40(3):273-292.
  • 6吴尔飞,金烨,汪峥.双边装配线第二类平衡问题研究[J].计算机集成制造系统,2005,11(11):1604-1608. 被引量:17
  • 7BAYKASOGLU A,DERELI T.Two-sided assembly line balancing using an ant-colony-based heuristic[J].International Journal of Advanced Manufacturing Technology,2008,36(5/6):582-588.
  • 8SIMARIA A S,VILARINHO P M.2-ANTBAL:An ant colony optimization algorithm for balancing two-sided assembly lines[J].Computers & Industrial Engineering,2009,56(2):489-506.
  • 9(O)ZCAN U.Balancing stochastic two-sided assembly lines:a chance-constrained,piecewise-linear,mixed integer program and a simulated annealing algorithm[J].European Journal of Operational Research,2010,205(1):81-97.
  • 10YUAN B,ZHANG C Y,SHAO X Y.A late acceptance hillclimbing algorithm for balancing two-sided assembly lines with multiple constraints[J].Journal of Intelligent Manufacturing,2013,1-10.DOI:10.1007/s10845_0710_X.

二级参考文献29

  • 1秦杏敏,金烨.A Heuristic Method for Two-sided Assembly Line Balancing Problem[J].Journal of Shanghai Jiaotong university(Science),2005,10(1):61-65. 被引量:5
  • 2万旭,林健良,杨晓伟.改进的最大-最小蚂蚁算法在有时间窗车辆路径问题中的应用[J].计算机集成制造系统,2005,11(4):572-576. 被引量:43
  • 3吴尔飞,金烨,汪峥.双边装配线第二类平衡问题研究[J].计算机集成制造系统,2005,11(11):1604-1608. 被引量:17
  • 4KIM Y K, KIM Y, KIM Y J. Two-sided assembly line balancing: a genetic algorithm approach[J]. Production Planning &-Control, 2000, 11(1): 44-53.
  • 5LEE T O, KIM Y, KIM Y K. Two-sided assembly line balancing to maximize work relatedness and slackness[J]. Computers & Industrial Engineering, 2001, 40(3): 273-292.
  • 6AGRAWAL P K. The related activity concept in assembly line balancing[J]. International Journal of Production Research,1985, 23(2): 403-421.
  • 7BAYBARS I. A survey of exact algorithms for the simple assembly line balancing problem [J]. Management Science,1986, 32(8): 909-932.
  • 8SCHOLL A, BECKER C. State-of-the-art exact and heuristic solution procedures for simple assembly line balancing [EB/OL]. http://www. wiwi. uni- jena. de/Entscheidung/alb/SALBP- Survey. pdf, 2004- 06 - 26.
  • 9BARTHODI J J. Balancing two-sided assembly lines: a case study[J]. International Journal of Production Research, 1993,31(10) : 2447-2461.
  • 10BECKER C,SCHOLL A.A survey on problems and methods in generalized assembly line balancing[J].European Journal of Operational Research,2006,168(3):694-715.

共引文献59

同被引文献45

引证文献9

二级引证文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部