期刊文献+

洋山深水港区码头导流堤工程对附近海域流场的影响 被引量:4

Impact of Diversion Dike Project in Yangshan Deepwater Port Upon Flow Field in Surrounding Seas
原文传递
导出
摘要 为了研究上海国际航运中心洋山深水港区四期工程导流堤工程对周边海域流场的影响,采用MIKE21里面的HD模块构建杭州湾及长江口海域整体潮流数值模型,分别对导流堤建成前后附近海域流场进行数值模拟,分析导流堤建成后工程附近海域流场特征。研究表明:导流堤建成后,四期码头前沿较大范围的回流区和缓流区基本消失,导流堤和四期码头前沿海流流向基本与码头走向保持一致,流速有所增大,导流堤的建设使码头前沿海流得到很好的改善,起到了归顺潮流的作用,有利于码头前沿水深的维持及船舶靠离港的安全。 To study the impact of the fourth phase diversion dike project in Yangshan deepwater port upon flow field in surrounding seas, this paper built a numerical simulation with the large computational domain covering Hangzhou Bay and the Yangtze River estuary by using MIKE21 HD module, simulated the flow field and analyzed the flow field characteristics of the waters near the project before and after the completion of the diversion dike. The studies showed that, after the completion of the diversion dike, a large range of recireulation zone and slow flow area disappears before the quay, the direction of diversion dike and current before the quay was basically consistent with the quay, the current speed had increased, the construction of the diversion dike made currents well improved before the quay, which made the currents passing well, in favor of maintaining depth before the quay and the se- curity when ship berthing and departures.
出处 《海洋湖沼通报》 CSCD 北大核心 2014年第4期128-138,共11页 Transactions of Oceanology and Limnology
基金 海洋公益性行业科研专项(201105009) 海洋公益性行业科研专项(201105010) 江苏省普通高校研究生科研创新计划项目(CXZZ11_0422)资助
关键词 洋山深水港 导流堤 流场 MIKE21 HD模块 数值模拟 Yangshan deepwater port Diversion dike Flow field Mike21 HD module numerical simulation
  • 相关文献

参考文献9

二级参考文献44

共引文献82

同被引文献23

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部